Sitemap
Pages
- Adidas Sports Store | Case Study
- Anti-Slip Flooring – Non Slip Coatings
- Anti-Static Flooring
- Automotive
- Aviation
- Birmingham
- Blackfriars Bakery
- Blackpool
- Blog
- Bradford
- Browns Hotel Portfolio
- Captive Shotblasting
- Carrier Transicold
- Chester
- Concrete Floor Repairs
- Contact Us
- Coventry
- Customer Testimonials
- Decorative Floor Finishes
- Derby
- East Midlands
- Electronics
- Engineering
- Epoxy Coatings
- Epoxy Screeds
- Floor Installation
- Floor Preparation
- Floor Repairs
- Floor Repairs
- Food and Beverage
- Food Hygiene Flooring
- Free Site Survey & Quote
- Garage Floor Coatings
- General Industry
- General Industry Portfolio
- Grinding
- Hard Landscaping
- Industrial Flooring
- Joint Repairs
- Lancaster
- Leeds
- Leicester
- Lightning Source Portfolio
- Line Marking
- Liverpool
- London & South
- Manchester
- Melville Exhibitions Portfolio
- North West
- Nottingham
- Office & Commercial
- Olympic Oils Ltd Project
- Pharmaceutical
- Polymer Screeds
- Polyurethane Coatings
- Polyurethane Screeds
- Portfolio
- Preparation overview
- Privacy Policy
- Project at Langham Park Developments, Derby. Refurbishment project
- Pump Screeds
- Resin Floor Solutions
- Retail
- Self-Levelling Floors
- Sheffield
- Stoke
- Tennco Walker Ltd
- Testimonials
- Virgin Project Portfolio
- Warrington
- West Midlands
- Winder Electrical
- Wolverhampton
- York
- Yorkshire
Projects
- A diamond grinder was used to prepare the 40 stanchions that were in the building
- A general overview of the flooring before work was carried out by Resin Floor Solutions
- A number of small offices were vacuum shot-blasted
- Adidas Sports Store
- Adidas Sports Store – Stage 1
- Adidas Sports Store – Stage 1 (cont)
- Adidas Sports Store – Stage 1(cont)
- Adidas Sports Store – Stage 2
- Adidas Sports Store – Stage 3
- Adidas Sports Store – Stage 3(cont)
- Adidas Sports Store – Stage 3(cont)
- Adidas Sports Store – Stage 3(cont)
- Adidas Sports Store – Stage 4
- Adidas Sports Store – Stage 4(cont)
- Adidas Sports Store – Stage 5
- Adidas Sports Store – Stage 5(cont)
- Adidas Sports Store – Stage 5(cont)
- Adidas Sports Store – Stage 5(cont)
- Adidas Sports Store – Stage 5(cont)
- Adidas Sports Store – Stage 6
- Adidas Sports Store – Stage 6(cont)
- Adidas Sports Store – Stage 7
- Adidas Sports Store – Stage 7(cont)
- Adidas Sports Store – Stage 7(cont)
- Adidas Sports Store – Stage 7(cont)
- Adidas Sports Store – Stage 8
- Adidas Sports Store – Stage 8(cont)
- Adidas Sports Store – Stage 9
- Adidas Sports Store – Stage 9(cont)
- Adidas Sports Store – Stage 9(cont)
- Adidas Sports Store – Stage 9(cont)
- After an overnight cure the second coat of High Build Epoxy was applied with added anti-slip bead.
- All the edge work was carried out using a hand held diamond grinder
- All the edge work was carried out using a hand held diamond grinder
- Blackfriars Bakery, Leicester
- Blackfriars Bakery, Leicester case study image 1
- Blackfriars Bakery, Leicester case study image 10
- Blackfriars Bakery, Leicester case study image 11
- Blackfriars Bakery, Leicester case study image 2
- Blackfriars Bakery, Leicester case study image 3
- Blackfriars Bakery, Leicester case study image 4
- Blackfriars Bakery, Leicester case study image 5
- Blackfriars Bakery, Leicester case study image 6
- Blackfriars Bakery, Leicester case study image 7
- Blackfriars Bakery, Leicester case study image 8
- Blackfriars Bakery, Leicester case study image 9
- Carrier Transicold in Oldham, Manchester. Refurbishment project.
- Coving in the Mayonnaise area
- General Industry
- General repairs of the joints
- Image 1
- Image 10
- Image 11
- Image 12
- Image 13
- Image 14
- Image 15
- Image 16
- Image 17
- Image 18
- Image 19
- Image 2
- Image 20
- Image 21
- Image 3
- Image 4
- Image 5
- Image 6
- Image 7
- Image 8
- Image 9
- Lightning Source UK Ltd
- Lightning Source UK Ltd Project 1
- Lightning Source UK Ltd Project 10
- Lightning Source UK Ltd Project 11
- Lightning Source UK Ltd Project 12
- Lightning Source UK Ltd Project 13
- Lightning Source UK Ltd Project 14
- Lightning Source UK Ltd Project 15
- Lightning Source UK Ltd Project 16
- Lightning Source UK Ltd Project 2
- Lightning Source UK Ltd Project 3
- Lightning Source UK Ltd Project 4
- Lightning Source UK Ltd Project 5
- Lightning Source UK Ltd Project 6
- Lightning Source UK Ltd Project 7
- Lightning Source UK Ltd Project 8
- Lightning Source UK Ltd Project 9
- Machinery was re-installed on the new Polymer Screed
- Melville Exhibitions
- Melville Exhibitions 1
- Melville Exhibitions 10
- Melville Exhibitions 11
- Melville Exhibitions 12
- Melville Exhibitions 13
- Melville Exhibitions 14
- Melville Exhibitions 15
- Melville Exhibitions 2
- Melville Exhibitions 3
- Melville Exhibitions 4
- Melville Exhibitions 5
- Melville Exhibitions 6
- Melville Exhibitions 7
- Melville Exhibitions 8
- Melville Exhibitions 9
- Olympic Oils Ltd Speke Liverpool
- Pools of standing water caused by a leaking roof, this was repaired before work to the floor could be started
- Project at Langham Park Developments, Derby. Refurbishment project.
- Tennco Walker case study image 1
- Tennco Walker case study image 2
- Tennco Walker case study image 3
- Tennco Walker case study image 4
- Tennco Walker case study image 5
- Tennco Walker case study image 6
- Tennco Walker case study image 7
- Tennco Walker case study image 8
- Tennco Walker case study image 9
- Tennco Walker Ltd
- The completed job and a satisfied client
- The coving was then installed creating a seamless finished floor
- The existing channel was extended and the screed was laid to fall
- The finished floor showing a glossy seamless finish
- The finished floor showing repaired joints
- The finished job completed over a weekend period and ready for use on the Monday morning. The client had no more problems with his employees slipping on the wet floor!!!
- The first coat of paint was completed.
- The floor was captive shot-blasted and sealed with a first coat of water based epoxy.
- The floor was coated and sealed with a water-based epoxy this was followed by a finish coat of high build epoxy coating. As the photograph denotes there is a distinctive finish in the base coat and second coat
- The floor was prepared by captive shot-blasting
- The Floor was vacuum shot-blasted and repairs were carried out using a suitable repair compound
- The Floor was vacuum shot-blasted and repairs were carried out using a suitable repair compound
- The high build epoxy coating was then applied leaving the floor with a nice gloss finish
- The job was completed within the four day time period.
- The Joints were damaged and broken up
- The Joints were damaged and broken up
- The old coating had lifted and flaked off the substrate
- The old floor tiles in the Mayonnaise Production Area were removed, the floor was then prepared, primed and a 6mm Polymer Screed was installed
- The Polymer Screed had to be laid under standing machinery
- The Sauce Production Area had to be completed in two phases due to production. The old floor screed was prepared, primed and a 6mm Polymer Screed was then installed
- The toilets were prepared using a vacuum assisted hand held diamond grinder
- The water-based seal coat was applied by roller, this high-lighted small repairs in the floor which were filled with a suitable repair compound
- View from Office Door
- Virgin Project
- Virgin Project 1
- Virgin Project 10
- Virgin Project 11
- Virgin Project 12
- Virgin Project 13
- Virgin Project 14
- Virgin Project 15
- Virgin Project 16
- Virgin Project 17
- Virgin Project 18
- Virgin Project 19
- Virgin Project 2
- Virgin Project 3
- Virgin Project 4
- Virgin Project 5
- Virgin Project 6
- Virgin Project 7
- Virgin Project 8
- Virgin Project 9
- Work started on repairing the bay joints