Call us: 07966 770821 | E-mail: [email protected]

The Sauce Production Area had to be completed in two phases due to production. The old floor screed was prepared, primed and a 6mm Polymer Screed was then installed

The Sauce Production Area had to be completed in two phases due to production. The old floor screed was prepared, primed and a 6mm Polymer Screed was then installed
Skills needed:
Categories:
Olympic Oils Ltd Speke Liverpool

Related projects

Top