The old floor tiles in the Mayonnaise Production Area were removed, the floor was then prepared, primed and a 6mm Polymer Screed was installed

The old floor tiles in the Mayonnaise Production Area were removed, the floor was then prepared, primed and a 6mm Polymer Screed was installed
Skills needed:
Categories:
Olympic Oils Ltd Speke Liverpool