View See details The old floor tiles in the Mayonnaise Production Area were removed, the floor was then prepared, primed and a 6mm Polymer Screed was installed
View See details The Sauce Production Area had to be completed in two phases due to production. The old floor screed was prepared, primed and a 6mm Polymer Screed was then installed