The floor was then coated with two-coats of Sika Ltd – Sikafloor 261, a solvent free, high build coloured...
The floor was then coated with two-coats of Sika Ltd – Sikafloor 261, a solvent free, high build coloured...
The floor was then coated with two-coats of Sika Ltd – Sikafloor 261, a solvent free, high build coloured...
The new coating was allowed to cure overnight.
The new coating was allowed to cure overnight.
The new coating was allowed to cure overnight.
The machinery and large reams of paper were then slowly moved back in ready for production to commence.