Call us: 07966 770821 | E-mail: [email protected]
Show:
The wooden laminate before work commenced.
The wooden laminate before work commenced.
Sanding/Abrading of the wooden floor.
The floor joint of the laminate floor are banded with a joint fleece.
The floor joint of the laminate floor are banded with a joint fleece.
The floor joint of the laminate floor are banded with a joint fleece.
The floor joint of the laminate floor are banded with a joint fleece.
The wooden floor is then primed with Remmers Epoxy FAS 100, allowed to cure and then sanded.
The wooden floor is then primed with Remmers Epoxy FAS 100, allowed to cure and then sanded.
Remmers PUR Indu Color Flow System is hand laid at a thickness of 4mm and is also applied onto...