
The existing substrate was generally in good condition, Fastrack mechanically prepared the floor using vacuum assisted sanding machines and hand held grinders for all edge work.
- Skills needed:
- Categories:
- Lightning Source UK Ltd
Call us: 07966 770821 | E-mail: [email protected]
The existing substrate was generally in good condition, Fastrack mechanically prepared the floor using vacuum assisted sanding machines and hand held grinders for all edge work.