Call us: 07966 770821 | E-mail: [email protected]

Project Archive

Image 1

Floor Preparation – The floor at Winder was prepared to remove any surface contamination. This was achieved by the...

Image 2

Resin Coating – A first coat of water-based resin coating was applied to seal the concrete floor. This was...

Image 3

Resin Coating – A first coat of water-based resin coating was applied to seal the concrete floor. This was...

Image 4

Resin Coating – A first coat of water-based resin coating was applied to seal the concrete floor. This was...

Image 5

Resin Coating – A first coat of water-based resin coating was applied to seal the concrete floor. This was...

Image 6

Resin Coating – A first coat of water-based resin coating was applied to seal the concrete floor. This was...

Image 7

Resin Coating – A first coat of water-based resin coating was applied to seal the concrete floor. This was...

Image 8

Resin Coating – A first coat of water-based resin coating was applied to seal the concrete floor. This was...

Image 9

Walkways/Gangways – A series of gangways were marked out and coated to identify a safe walkway for employees to...

Image 10

Walkways/Gangways – A series of gangways were marked out and coated to identify a safe walkway for employees to...

1 2 3 17
Top