This project was carried out over two floors at the new Adidas Sports Store located in the Arndale Centre, Manchester.

Resin Floor Solutions were approached by the client initially as the floor was covered with laminate wood and removal of this would be a costly procedure. Because of the nature of the laminate, the client was looking for a flexible yet durable floor system finish that would adhere well to the laminate wood.

The solution was to mechanically abrade all the wood laminate to provide a suitable key for the new floor system. The next step was to cover/band all the joints of the laminate with a joint fleece and then prime with Remmers Epoxy FAS 100 primer. The floor was once again sanded before Remmers PUR Indu Color Flow System was hand laid at a 4mm thickness. A finishing coat of Remmers Arti Top M Matt Sealer was then applied as a finishing seal coat.

 

 